Sewer Line Repairs

A leak was discovered mid-October in the Fairhaven sewer line. Facilities Development & Operations (FDO) has since partially completed visual condition assessments. Immediate repair is needed and will occur between November 8 and December 8, 2023. Repairs will include temporary water shutoff in stacks 1, 2, 3, and 5. Alternate bathroom and water source options in the other Fairhaven stacks will be available during this time. There will be construction occurring in the courtyard, which will restrict walkways and cause noise during the workday. Please read below for more detailed information.

  • Urgent repairs are planned to address issues related to Stacks 1, 2, 3, 5 based upon severity of conditions. Further details regarding this effort are outlined in PHASE 1 below.
  • Less urgent repairs to Stacks 4, 6, 7, 8 will be completed Summer 2024.
  • Condition assessments are still required at Fairhaven Stacks 9 through 12, on the lateral line connecting the Dining Hall grease interceptor unit to the main sewer line, and as further investigative efforts warrant specified actions. Based upon these findings, repair plans will be formulated as needed and updates provided accordingly.

Phase 1

FDO and Contractor team members will be performing repairs at Stacks 1, 2, 3, 5 starting on November 8 (Wednesday) and continuing through December 8 (Friday) with all noisy work being performed only on weekdays from 9:00am – 6:00pm unless otherwise noted. NOTE: If extenuating circumstances require that the work period extends beyond the work period noted, work will stop during Finals Week and commence on December 18 (Monday) as needed.

Service Shutdowns: Domestic hot/cold water and sewer waste line service shutdown to Stack 3 is scheduled for November 17 & November 20 between 7:30 am - 5 pm to support repairs.

  • There will be no access to operable restrooms, showers, or sinks within the buildings during shutdowns. Alternate resources located below.
  • Service shutdown notices for Stacks 1, 2, 5 will be sent the day before planned disruptions factoring in project status to ensure timely updates and required preparatory details.

Impacts: Residents should expect intermittent noise related to heavy equipment operations in external pathway areas near buildings requiring repair, restricted pedestrian flow within the Fairhaven complex (please follow posted detour routes), increased vehicular traffic (please be mindful of trucks), added smells related to repair efforts, visible debris (soil, concrete, removed vegetation), other construction related inconveniences.

FX Sewer Repair Meeting (Recorded on 11-13)

Click here to watch

Passcode:?.8El6zU

Alternate Resources

  • Fairhaven Academic building public restrooms located on the 1st floor.
  • Fairhaven Stacks 1 through 10 single-use restrooms located on the 1st floor.
  • All Fairhaven stacks have community bathrooms located on the 3rd floor. Please be respectful of current occupants of these suites when using these bathrooms and note these bathrooms are gender-specific; utilize available bathrooms as appropriate: 
    • Male: Stacks 4, 11, 12
    • Female: Stacks 1, 2, 3, 5
    • Neutral: Stacks 6, 7, 8, 9, 10
  • All Fairhaven stacks have community bathrooms located on the 3rd floor. Please be respectful of current occupants of these suites when using these bathrooms and note these bathrooms are gender-specific; utilize available bathrooms as appropriate: 
    • Male: Stacks 4, 11, 12
    • Female: Stacks 1, 2, 3, 5
    • Neutral: Stacks 6, 7, 8, 9, 10
  • Showers located at Wade King Recreation Center will be available for use.
  • We are also exploring the feasibility of providing portable shower and/or privacy bathroom options. If this becomes available, we will update you accordingly.
  • Fairhaven Academic building drinking fountains and hydration stations located on the 1st floor.
  • All Fairhaven Stacks drinking fountains, hydration stations, and kitchen/public restroom sinks. Tap water is safe for consumption.
  •  A limited supply of bottled water will also be made available in the main lounges of Fairhaven Stacks 1, 2, 3, 5 for resident consumption and convenience during the limited shutdown period.

Questions?

We appreciate your cooperation while we work to restore your building to operating capacity. If you have questions or concerns, please contact residencesfacilities@wwu.edu or 360-650-3556.

Past Projects

Scope: Facilities Development and Operations (FDO) painters will be performing painting of stacks 11 and 12 which includes entry points, hallways, stairways, lounges, laundry rooms, and public restrooms.

Schedule: Monday, November 6 – Friday, December 1 from 9:00 a.m. – 5:00 p.m.

Impact: Residents may experience the following occasional impact:

  • Construction odors from paint, adhesives, and sealants
  • Dust, some noise, and wet paint

Please note: Workers will not need to enter your room or suite during the work.